A Navi Mumbai developer needed parking above an existing water tank. A competing vendor had proposed a rotary system at significant cost.
AcePark ran detailed structural calculations on the tank slab and proposed a three-level stack instead, delivering the same vehicle count for approximately ₹50 lakh less, with no compromise on safety factors.
The project is complete and operational.

