Service

EV Charging

Charge points on mechanical parking pallets, planned with the structural load from day one.

EVs are heavier and they need power at the pallet. AcePark systems are engineered at 3,000 kg per pallet precisely so EV weight is not a retrofit problem, and cable routing is designed with the platform travel, not bolted on afterwards.

We coordinate the electrical scope with your MEP consultant so the charging load and the parking load are approved together.

Included

  • 3,000 kg pallets accommodate EV kerb weight
  • Cable management designed around platform travel
  • AC charge points on ground and upper levels
  • Load coordination with your MEP consultant