Navi Mumbai · Ace Quad · Four Level Stack
A Failed System Scrapped and Rebuilt From Zero
We solve infrastructure problems others created.
The challenge
The builder's original vendor delivered a non-functional four-level system. Demolition costs and further delay were on the table.
What AcePark did
AcePark evaluated the failure, scrapped the setup entirely and designed from scratch with Jindal and Apollo heavy-duty steel and mechanical locking. The facility operates flawlessly today.
Status
Completed and operational
100%
Complete rebuild
60
Day installation standard
System supplied
Ace Quad · Four Level Stack
Location: Navi Mumbai

