Navi Mumbai · Ace Quad · Four Level Stack

A Failed System Scrapped and Rebuilt From Zero

We solve infrastructure problems others created.

The challenge

The builder's original vendor delivered a non-functional four-level system. Demolition costs and further delay were on the table.

What AcePark did

AcePark evaluated the failure, scrapped the setup entirely and designed from scratch with Jindal and Apollo heavy-duty steel and mechanical locking. The facility operates flawlessly today.

Status

Completed and operational

100%

Complete rebuild

60

Day installation standard

System supplied

Ace Quad · Four Level Stack

Location: Navi Mumbai